Closing Checklist
From Bikerowiki
This is a working draft. If you have ideas for improving please implement them!
- Announce cleanup 1-1/2 hrs. before closing time.
- Clear all work areas of parts, put them in: project bins/donations/recycling.
- Tools- Put away tools inside & outside shop. Look 4 missing tools & note condition if damaged.
- Clean work bench areas of dirt, grease, etc.
- Announce closing 1 hour before closing time.
- Clean sink and parts washer areas, as needed.
- Sweep floor in shop. Please check outside too.
- Tool board, check for missing/damaged tools, 2nd-time.
- Empty trash, please sort-out any recycleable materials into the correct bins.
- Reannounce closing 1/2 hour before closing.
- Bikes- Move floor bikes back inside shop.(first, then:)
- Racks- Move bike racks back inside shop.(in that order)
- Signs, bring in BRW signs from their specified locations.
- Tools- Final check for missing/damaged tools & log as found.
- Cash drawer, count & log contents of cash drawer.
- Turn OFF: music, computer, coffee machine, heater, fan, Lights, thank you!
- Lock both locks on Office-Door & Front-door. Double check it's securely locked.
- Safe ride home. :)